McKamish was selected as the prime mechanical contractor for the lab at Calgon Carbon's office building.
McKamish was the prime contractor, holding all of the subcontracts for the new standalone system for the Calgon Carbon Lab. The project included a custom roof top unit, a 29 fume hood fully functioning lab within a specified office building, custom duct collection system with an integrated fire suppression system and lab gasses. The largest challenge to this project was getting all of the mechanical systems from the first floor where the lab was located to the rooftop.